Skip to content
Systems

Cooling Water Treatment

Bottom-sweep collectors and filtration lines for cooling tower basins.

  • Capacity20 m³/hÇiğli project
  • ManufacturingBottom-sweep manifolddimensioned to the basin
  • AutomationPanelinstallation and commissioning included
  • DeliverySingle sourcepiping and commissioning

In a cooling tower the water evaporates and concentrates; sediment builds up at the bottom of the basin and the circulating water gradually fouls. That contamination reduces heat transfer and leads to blockage and corrosion in the equipment.

The remedy is to sweep and filter the basin water continuously. The line we built on our active project in Çiğli works on exactly this principle.

Cooling Water Treatment

1 / 2

How it works

Stages

  1. 01

    Bottom sweep

    Sediment at the bottom of the basin is collected by a manifold.

  2. 02

    Filtration

    The swept water is passed through the filtration line.

  3. 03

    Return

    The cleaned water is returned to the basin.

  4. 04

    Automation

    Operating and backwash cycles are managed from the panel.

Where it is used

Typical applications

  • Cooling towers

    Continuous removal of sediment accumulating at the basin floor.

  • Heat transfer

    Reduction of efficiency losses caused by fouling.

  • Equipment protection

    Prevention of blockage in heat exchangers and pumps.

  • Water saving

    Making a higher number of concentration cycles possible.

Related project · March 202620 m³/h

Cooling Water · Çiğli, İzmir

Bottom-sweep collector, control panel and piping

All projects →

Side-stream filtration

In cooling water it is usually unnecessary to filter the full flow; filtering a portion of the circulating water continuously is enough. Which proportion to choose is determined by the basin volume and the contamination load.

Frequently asked questions

Can it be applied to our existing tower?

Yes. Once the basin dimensions and the existing pipework have been surveyed, the manifold is manufactured accordingly.

Send us your raw water analysis and the flow rate you need

Let us size the system together; we will survey the site in person if needed.